Canberra Light Rail Stage 2A

Quadrant Rail Consulting (QRC) was engaged by Canberra Metro to support the Stage 2A extension of the Canberra Light Rail network. This key expansion adds 1.7 km of wire-free track and three new stops, enhancing connectivity between the city and Commonwealth Park.

QRC led the operations stream for the bid, covering rostering, timetabling, operational modelling, and O&M organisational design. We also provided commercial and legal leadership, reviewed technical designs and systems, and developed all operational bid returnables. Our practical insights from Stage 1 were instrumental in guiding design reviews, testing, and commissioning. QRC continues to act as the trusted link between the current O&M operation and Stage 2A delivery.