Quadrant Rail Consulting (QRC) was engaged by Canberra Metro to support the Stage 2A extension of the Canberra Light Rail network. This key expansion adds 1.7 km of wire-free track and three new stops, enhancing connectivity between the city and Commonwealth Park.
QRC led the operations stream for the bid, covering rostering, timetabling, operational modelling, and O&M organisational design. We also provided commercial and legal leadership, reviewed technical designs and systems, and developed all operational bid returnables. Our practical insights from Stage 1 were instrumental in guiding design reviews, testing, and commissioning. QRC continues to act as the trusted link between the current O&M operation and Stage 2A delivery.